Can a new bridge or tunnel be built from Alameda?
FAQ or Point:
Taxonomy upgrade extras:
A new bridge is not feasible due to the height required by the Port of Oakland. A drawbridge is unlikely, as it would interfere with the rapid response requirement of the Coast Guard ships located at Coast Guard Island.
We are not aware of any feasibility studies ever performed on the construction of an additional tunnel to Oakland. However, the 1998 “Draft Report – Alameda Point Financing Plan" assumes that no new bridge or tunnel will be built due to the report's educated guess that either crossing would cost between $300 and $700 million (in 1998 dollars).