Toxic Cleanup Images #3

Title Content Type Post date
Completed groundwater cleanup near East Gate. February 2011. See earlier image with piping on ground. Image Gallery Pic 02/17/2011
Groundwater bioremediation cleanup apparatus near North Housing and Island High School Image Gallery Pic 07/17/2010
Groundwater cleanup near North Housing and Island High School Image Gallery Pic 07/17/2010
Groundwater cleanup located just inside East Gate entrance to Alameda Point. (Alameda Point Info photo) Image Gallery Pic 04/12/2010
Site 26 - Groundwater cleanup site at Building 20 - western hangar zone. Image Gallery Pic 04/12/2010
Site 16 - Groundwater remediation areas where sodium persulfate amended with ferrous sulfate is used. Image Gallery Pic 04/12/2010
Site 6 - Groundwater remediation map Image Gallery Pic 04/12/2010
White pipes indicating monitoring wells for underground remediation in Northwest Territories along Oakland Estuary. (Alameda Point Info photo) Image Gallery Pic 04/12/2010
Site 27 - Contractor injecting chemicals. (Alameda Point Info photo) Image Gallery Pic 04/12/2010
Site 27 - Contractor making the rounds injecting chemicals. Pump/extraction apparatus on skids. (Alameda Point Info photo) Image Gallery Pic 04/12/2010
Site 27 - Navy contractor at work injecting chemicals. (Alameda Point Info photo) Image Gallery Pic 04/12/2010
Site 27 injection and recirculation pumps for chemicals used in underground remediation. (Navy photo) Image Gallery Pic 04/12/2010
Site 27 - Mixing chemicals prior to injection underground to neutralize toxic contamination. (Navy photo) Image Gallery Pic 04/12/2010
Site 27 - Loading oxidant prior to injection of chemical. (Navy photo) Image Gallery Pic 04/12/2010
Site 27 hole boring rig. (Navy photo) Image Gallery Pic 04/12/2010
Site 27 groundwater treatment locations Image Gallery Pic 04/12/2010
Map showing Site 27 where contaminated groundwater is currently undergoing remediation by chemical injection - see accompanying photos. Image Gallery Pic 04/12/2010
Plume 5-1 vapor collection system from contaminated groundwater Image Gallery Pic 04/12/2010
Electrode installation for 6-phase heat remediation of contaminated groundwater at Plume 5-1 Image Gallery Pic 04/12/2010