STORM DRAINAGE AND WATER QUALITY

"[I]f there is a concern with sea level rise, the lack of pump stations minimizes the flexibility of the design. The Specific Plan does not specify how these deficiencies will be addressed. . . . The additional annual maintenance costs associated with these facilities are not included in the fiscal analysis described in Chapter IV [Fiscal Impact]." (p. 23.)